Solectria Inverters Power 22 MW in Massachusetts

July 1, 2014 By Linda Hardesty

Solectria energy manageInnovative Engineering Solutions (IESI) chose Solectria Renewables’ SMARTGRID Inverters for seven solar projects in Massachusetts, totaling 22 MW.

These projects are a combination of the Concord Landfill, the Grafton Water District (a water utility in Grafton which required MassDEP permission to construct), and five commercial sites (a medical device manufacturer in Chicopee; Skyline Trail in Chester; Mount St. Mary’s Abbey in Franklin; Stetson Road in Barre; and Britton Road in Barre).

 

Leave a reply


*