CalCom Solar to Deploy 1.1MW at Dairy

CalCom Solar has commenced installation of a 1.1 MW solar power system at Medeiros and Son Dairy in Hanford, California. CalCom Solar is deploying NEXTracker technology in this array, and the project will be completed in Summer 2015.

Beginning in Q3 2015, Medeiros will save about $320,000 annually on utility bills. According to the dairy, by deploying solar, it will also be able to reduce its peak-hour electrical demand on fans, chillers and well pumps.

The new PV array deployment leverages Net Energy Metering Aggregation (NEMA), affording CalCom the ability to install Medeiros’ solar array where it can return dividends on once unproductive ground.

Packaging LED & Advanced Rooftop Unit Control (ARC) Retrofits for Maximum Performance
Sponsored By: Transformative Wave

  
Four Key Questions to Ask Before Your Next Energy Purchase
Sponsored By: EnerNOC, Inc.

  
Financing Environmental Resiliency and a Low-Carbon Future with Green Bonds
Sponsored By: NSF International

  
Choosing the Correct Emission Control Technology
Sponsored By: Anguil Environmental Systems

  

Leave a Comment

User Name :
Password :
 
If you've no account register here first time
User Name :
User Email :
Password :

Login Now