Vermont Energy Manage

Meach Cove Farms Installs 2.96 MW Solar

Vermont Energy ManageGroSolar completed a 2.96 MW solar photovoltaic system in Shelburne, Vt., on 15 acres of the 1,000-acre Meach Cove Farms.

Average annual electrical production from the facility is estimated to be 3,450,000 kWh. The electricity produced will be sold to Vermont utilities under the state’s Sustainably Priced Energy and Economic Development (SPEED) program. The solar facility uses 9,878 Renesola 300-watt photovoltaic modules mounted on a Schletter racking system. DC power is converted into utility-grade AC power by five Advanced Energy inverters located in two PowerStation enclosures.

The Corporate Sustainability Professional's Guide to Better Data Management
Sponsored By: Urjanet

  
How Tracking/Managing Energy Consumption Drives Real Cost Savings
Sponsored By: Digital Lumens

  
Inside an Energy Management Investment Strategy
Sponsored By: EnerNOC, Inc.

  
Planning for a Sustainable Future
Sponsored By: Dakota Software

  

Leave a Comment

User Name :
Password :
 
If you've no account register here first time
User Name :
User Email :
Password :

Login Now