ABM Energy Manage

Medical Center Hires ABM for $8M Energy Project

ABM Energy ManageArnot Ogden Medical Center (AOMC) in Elmira, New York, selected ABM to complete an $8 million energy conservation project through ABM’s Bundled Energy Solutions program. The contract builds on ABM’s existing six-year healthcare support services role within the hospital and is expected to reduce AOMC’s annual water and energy usage by 20 percent.

With ABM’s Bundled Energy Solutions program, critical facility improvements can be implemented through budget-neutral financing.

The project includes major enhancements to the medical center’s central plant, including the installation of new boilers and chillers, and modifying its existing energy control system. In all, AOMC is set to save about $600,000 in annual energy and operational costs.

Financing Environmental Resiliency and a Low-Carbon Future with Green Bonds
Sponsored By: NSF International

  
Packaging LED & Advanced Rooftop Unit Control (ARC) Retrofits for Maximum Performance
Sponsored By: Transformative Wave

  
The Hidden Costs of Air Compressor Operation
Sponsored By: FS-Elliott

  
The EHS Guidebook: Selecting, Implementing, and Using EHS Software Solutions
Sponsored By: EtQ

  

Leave a Comment

User Name :
Password :
 
If you've no account register here first time
User Name :
User Email :
Password :

Login Now