GBC Turbine Energy Manage

Wind Installation Saves Kansas Telecom Thousands in Energy Costs

GBC Turbine Energy ManageNorthern Power Systems and BTI Energy are partnering to install multiple wind turbines across the United States. The latest Northern Power/BTI Energy installation has generated about 30,000 kWh for Kansas-based telecommunications company Golden Belt Communications (GBC) in its first month of operation, exceeding GBC’s expectations and saving the company more than $3,000 in energy expenses.

Northern Power’s NPS 100-24 turbine features an optimized rotor configuration, which allows for higher annual energy production and allows BTI Energy to install wind turbines at sites with lower wind speeds and historically lower electricity rates.

BTI Energy has installed more than 170 wind projects throughout North America.

(Visited 1 times, 1 visits today)
[Datasheet] Track and Manage Field Operations
Sponsored By: Progressly

Choosing the Correct Emission Control Technology
Sponsored By: Anguil Environmental Systems

5 Reasons To Make the Switch from Scantron
Sponsored By: Progressly

Leveraging EHS Software in Support of Culture Changes
Sponsored By: VelocityEHS


Leave a Comment

User Name :
Password :
If you've no account register here first time
User Name :
User Email :
Password :

Login Now
Translate »